Co-Location Sites in the UK     


London - City,  London - West,  London - SE,  Slough,  Maidenhead, 
Bournemouth,  Milton Keynes,  Manchester


London
– City


Power

 

• AC power voltage: 230 Volt or 400 Volt (32 or 64 Amp)

• AC 230 V power breakers: 16 or 32 Amp

• DC power voltage: 48 Volt

• Dual diverse power feeds available to racks


Air-Conditioning

• Equipped with redundant cooling equipment

• Multiple air conditioning units with N+1 configuration provide redundancy

• Room temperature is maintained at 22°C ± 2°C and a humidity level of 50% ± 10%.

 

Fire Protection & Security

 

• Very Early Smoke Detection Alarm (VESDA) system

Fire detection and gas-based fire suppression systems 

• 24x7 Onsite engineers and remote hands

• Restrooms and kitchen facilities available

 

 

West London

 

Power 

• Up to 30kW per cabinet
• 2N total Power independence to all cabinets
• On-site power generation with multi-day autonomy
• Dual feed as standard
• Switched and metered PDU’s available
 

Air-Conditioning
 

• Ambient HVAC and high-density (Hot Aisle Containment System) cooling 
• 2N, UPS, generator-backed chilled water control
• N + 1 on floor Air conditioning units
 

Fire Protection & Security
 

• Three stage protection
• FM200 fire suppression for clean rooms, plus internal and external plant
• Strong security focus
• Multi-factor biometric authentication
• 24x7 security control and megapixel IP CCTV
• Ensuring efficient access for authorized personnel
• Perimeter fencing
• Concrete walls 142mm by 4m
• IQ Nvision 5 megapixel CCTV
• Manned 24/7 (security guards out of office hours)
• Turnstile entry
• Cages available Communications
 
• On-net with major carriers
• Ethernet LAN extension services available direct to all major UK data centres
• Connected onto industry leading multiple 10 Gigabit UK network
• Managed internet services
• Interconnects available Onsite Services
 
• 24/7 onsite Engineers
Free car parking
• Remote Data Backup/Storage

 
  

SE London

 

Power 

• 2 x 1.0mva dedicated power supply. One supply per server room
• Dual 16-32a commando sockets, dedicated radial SWA cables, “A” and “B"
• 22 x 500kva synchronised (N+N) Emerson HiPulse “E” range, Double conversion static UPS, per server room
• Each UPS to have a 5-string set of 10 year life batteries, 15 mins autonomy 
• 5 x 500kva Diesel Generators (N+1) Parallel synchronised to feed the site
• Air cooled, Turbo charged Volvo, Electronic governor, Marelli alternator
• Close fitting acoustic enclosure and integral 8 hr “day” tank Air-Conditioning 
• 8 x 80kw, DX (R407), Full Function, Downflow, CRAC units server room (N+1)
• UPS room cooling load 600Kw – 2 x 80Kw DX, Upflow, CRAC units (N+N)
• Room condition -23 0C, 45% RH

 

Fire Protection & Security

 • Independent smoke detection systems to the plant room and server rooms
• VESDA in the plant room, server rooms
• Plant room and server rooms each with Argonite gas suppression system
• General areas and offices on main building smoke detection system
• Multizone panel with sensing tape per server room, and in Plant/Meet rooms
• PAC card access to the main entrance, and ancillary areas
• Palm readers to server room doors
• 24 x 7 Manned Security
• CCTV on main entrance, loading bay server rooms and plant room
• Motorised Dome, Low light level, CCTV camera to the external provider
 

 
Slough

Power and Cooling 

• Minimum N+1 redundancy on power supply
• Mains power supplied via 2 x 11kV incomers
• Diverse A&B supply 11kV ring main units
• N+N 800KVA 
• Power and cooling systems supported by diesel generation back up power
• On-Site diesel tanks support non-stop back up power generation              
• Minimum N+1 resilience on chilled water cooling system
• Temperature in data centre space maintained at 21 Deg;C ( +/- 2oC)
• Humidity range of 50% (+/-10%) in data centre space
Air cooled chillers supplying 1.68MW of cooling
• Close control units (CCUs) delivering 1MW of conditioned air into the DC

Fire Protection & Security
 

• VESDA Smoke detection system
• Hi-Fog suppression using centrally stored nitrogen gas
• Features redundant _bre sources,redundant switches and core routers.
• Engineered to comply with PCI DSS Service Provider requirements
• Dedicated facilities management team
• Security with strictly enforced visitation procedures
• Access control using proximity card readers
Multiple CCTV cameras
Secure managed delivery and loading area Racks 
• Heavy duty 42U racks
• 80 % air space back and front
• Secure locks – Keys to each rack are held on-site
• 2x Power distribution panels ( 2 x 24 way outlets)
Rack is dual fed 240V AC – single phase terminated by 32 Amp commando socket ( Grid A & Grid B)
Maximum current draw of 16 Amps or 32 Amps per rack.
 

 

Maidenhead

 

Power 

• 10,000 sq ft data centre
• 1.5 mW onsite substation with diverse power feeds
• Multiple generators in N+1
• N+1 Redundant Parallel UPS system
• Single a dual power feeds available to racks
• Power to racks available on 8Amps, 16 Amps, Multiple 16 Amps 

Air-Conditioning
 

• N+1 Airdale Air Handling systems
• 22C +/- 2C data floor temperature
• Cold Isle Containment available 

Fire Protection & Security
 

• 3-metre fencing and electric entry
• Anti-tailgating systems
• Entry to the buildings is via 24/7 swipe card systems
• 6-layer entry and 24/7 on-site Security
• CCTV
• Multiple stage protection
• FM200 fire suppression for clean rooms, 
• Distributed Colocation Options
• Direct connectivity onto one of the UK's largest Metro Networks
• Premium Connectivity Services
• 40Gbps of Direct Upstream Connectivity
• Reliability of one of the UK's largest independent colocation providers
• Interconnects available direct to 25 data centres across Europe 

Onsite Services
 

• Office space available
• Secure cages from 126 sq.ft available with or without Racks
• 24x7 Onsite engineers and remote hands
• Restrooms and kitchen facilities available on all floors

  

Bournemouth

 

Power

• Dedicated onsite transformer
·    3 x Diesel Generators as back-up – N + 1
·    UPS system – redundant parallel formation – N + 1
8, 16 and 32 Amps available per rack Air-Conditioning 
·    Multiple AC units to guarantee control of air conditioning and humidity – N + 1

Fire Protection & Security 

• Very early smoke detection apparatus (VESDA) installed
• FM200 fire suppression system• Under floor flood detection system
• CCTV system covering all entrances/exits and main areas
·    24-hour video recording
• Full perimeter alarm
Biometric security access system for additional security
Visual verification of all persons entering the data floor Communications 
• Multiple Fibre connections into the building
• Connectivity and fibre available to major carriers eg BT, NTL/Virgin & H20
• Satellite dish space available on the roof
Microwave space available on the roof
Dual diverse 10Gbps connectivity (upgradable to 100Gbps) 
Onsite Services
• Shared, partitioned or dedicated space available
- 24 hour access – 365 days a year
• Remote Intelligent hands available 24 hours a day
• Reboots by telephone and online through customer control panel
Managed services available
Onsite Cisco and Microsoft certified engineers
 

 

Milton Keynes


Power
 

• 2 x 3 megawatt sub-stations (N+N)
• G&M generators (N+N) with 30 hours of on-site fuel storage
• N+N Chloride UPS system @ 10 minutes autonomy
• A+B power feeds to each rack
• Power up to 15kW per rack available Air-Conditioning 
• N+1 chilled water Air handling system with free cooling
• 22 C +/- 2 C data floor temperature 

Fire Protection & Security
 

• 2-metre fencing and electric entry
• Anti-tailgating systems
• Entry to the buildings is via 24/7 swipe card systems
• Multi layer entry and 24/7 on-site Security Communications 
• Distributed Colocation Options
• Connectivity onto one of the UK's largest data centre Networks
• Premium Connectivity Services
• Multiple direct Tier 1 network providers 
• 40Gbps of Direct Upstream Connectivity
• Reliability of one of the UK's largest independent colocation providers
• Interconnects available direct to over 25 data centres across Europe
• Geographically diverse connectivity from London and direct connectivity to       Manchester available. 

Onsite Services
 

• Colocation space available from single U’s to racks and suites
• Restrooms and kitchen facilities available on all floors
• Size: 25000 sq ft


Manchester

 

Power

Dedicated onsite transformer
·    Standby Diesel Generators as back-up
• N + 1 Redundant UPS system
• 8, 16 Amps available per rack Air-Conditioning 
·    Multiple AC units guarantee control of air conditioning & humidity - N + 1  

Fire Protection & Security
 

• Very early smoke detection apparatus (VESDA) installed
• FM200 fire suppression system
• CCTV system covering all entrances/exits and main areas
- 24-hour video recording
Full perimeter alarm
Visual verification of all persons entering the data floor
 Communications 
• Multiple Fibre connections into the building
• Connectivity and fibre available from major carriers eg. BT, NTL/Virgin & Geo
Direct Tier 1 carriers available by Layer 2 network
Dual diverse connectivity to over 25 data centres
 Onsite Services 
• Shared, partitioned or dedicated space available
- 24 hour access – 365 days a year
• Remote Intelligent hands available 24 hours a day



For More Information...

Please contact us for more information regarding DCPSOL'S Data Centre Solutions on:  +44 (0)2031119668  +44 (0)2031119668  Email: info@dcpsol.com * Contact Us


 
XML Sitemap
  Site Map