Co-Location Sites in the UK
London - City, London - West, London - SE, Slough, Maidenhead, Bournemouth, Milton Keynes, Manchester
London – City
Power
• AC power voltage: 230 Volt or 400 Volt (32 or 64 Amp)
• AC 230 V power breakers: 16 or 32 Amp
• DC power voltage: 48 Volt
• Dual diverse power feeds available to racks
Air-Conditioning
• Equipped with redundant cooling equipment
• Multiple air conditioning units with N+1 configuration provide redundancy
• Room temperature is maintained at 22°C ± 2°C and a humidity level of 50% ± 10%.
Fire Protection & Security
• Very Early Smoke Detection Alarm (VESDA) system
• Fire detection and gas-based fire suppression systems
• 24x7 Onsite engineers and remote hands
• Restrooms and kitchen facilities available
West London
Power
• Up to 30kW per cabinet • 2N total Power independence to all cabinets • On-site power generation with multi-day autonomy • Dual feed as standard • Switched and metered PDU’s available
Air-Conditioning
• Ambient HVAC and high-density (Hot Aisle Containment System) cooling • 2N, UPS, generator-backed chilled water control • N + 1 on floor Air conditioning units
Fire Protection & Security
• Three stage protection • FM200 fire suppression for clean rooms, plus internal and external plant • Strong security focus • Multi-factor biometric authentication • 24x7 security control and megapixel IP CCTV • Ensuring efficient access for authorized personnel • Perimeter fencing • Concrete walls 142mm by 4m • IQ Nvision 5 megapixel CCTV • Manned 24/7 (security guards out of office hours) • Turnstile entry • Cages available Communications • On-net with major carriers • Ethernet LAN extension services available direct to all major UK data centres • Connected onto industry leading multiple 10 Gigabit UK network • Managed internet services • Interconnects available Onsite Services • 24/7 onsite Engineers • Free car parking • Remote Data Backup/Storage
SE London
Power
• 2 x 1.0mva dedicated power supply. One supply per server room • Dual 16-32a commando sockets, dedicated radial SWA cables, “A” and “B" • 22 x 500kva synchronised (N+N) Emerson HiPulse “E” range, Double conversion static UPS, per server room • Each UPS to have a 5-string set of 10 year life batteries, 15 mins autonomy • 5 x 500kva Diesel Generators (N+1) Parallel synchronised to feed the site • Air cooled, Turbo charged Volvo, Electronic governor, Marelli alternator • Close fitting acoustic enclosure and integral 8 hr “day” tank Air-Conditioning • 8 x 80kw, DX (R407), Full Function, Downflow, CRAC units server room (N+1) • UPS room cooling load 600Kw – 2 x 80Kw DX, Upflow, CRAC units (N+N) • Room condition -23 0C, 45% RH
Fire Protection & Security
• Independent smoke detection systems to the plant room and server rooms • VESDA in the plant room, server rooms • Plant room and server rooms each with Argonite gas suppression system • General areas and offices on main building smoke detection system • Multizone panel with sensing tape per server room, and in Plant/Meet rooms • PAC card access to the main entrance, and ancillary areas • Palm readers to server room doors • 24 x 7 Manned Security • CCTV on main entrance, loading bay server rooms and plant room • Motorised Dome, Low light level, CCTV camera to the external provider
Slough
Power and Cooling
• Minimum N+1 redundancy on power supply • Mains power supplied via 2 x 11kV incomers • Diverse A&B supply 11kV ring main units • N+N 800KVA • Power and cooling systems supported by diesel generation back up power • On-Site diesel tanks support non-stop back up power generation • Minimum N+1 resilience on chilled water cooling system • Temperature in data centre space maintained at 21 Deg;C ( +/- 2oC) • Humidity range of 50% (+/-10%) in data centre space • Air cooled chillers supplying 1.68MW of cooling • Close control units (CCUs) delivering 1MW of conditioned air into the DC
Fire Protection & Security
• VESDA Smoke detection system • Hi-Fog suppression using centrally stored nitrogen gas • Features redundant _bre sources,redundant switches and core routers. • Engineered to comply with PCI DSS Service Provider requirements • Dedicated facilities management team • Security with strictly enforced visitation procedures • Access control using proximity card readers • Multiple CCTV cameras • Secure managed delivery and loading area Racks • Heavy duty 42U racks • 80 % air space back and front • Secure locks – Keys to each rack are held on-site • 2x Power distribution panels ( 2 x 24 way outlets) • Rack is dual fed 240V AC – single phase terminated by 32 Amp commando socket ( Grid A & Grid B) • Maximum current draw of 16 Amps or 32 Amps per rack.
Maidenhead
Power
• 10,000 sq ft data centre • 1.5 mW onsite substation with diverse power feeds • Multiple generators in N+1 • N+1 Redundant Parallel UPS system • Single a dual power feeds available to racks • Power to racks available on 8Amps, 16 Amps, Multiple 16 Amps
Air-Conditioning
• N+1 Airdale Air Handling systems • 22C +/- 2C data floor temperature • Cold Isle Containment available
Fire Protection & Security
• 3-metre fencing and electric entry • Anti-tailgating systems • Entry to the buildings is via 24/7 swipe card systems • 6-layer entry and 24/7 on-site Security • CCTV • Multiple stage protection • FM200 fire suppression for clean rooms, • Distributed Colocation Options • Direct connectivity onto one of the UK's largest Metro Networks • Premium Connectivity Services • 40Gbps of Direct Upstream Connectivity • Reliability of one of the UK's largest independent colocation providers • Interconnects available direct to 25 data centres across Europe
Onsite Services
• Office space available • Secure cages from 126 sq.ft available with or without Racks • 24x7 Onsite engineers and remote hands • Restrooms and kitchen facilities available on all floors
Bournemouth
Power
• Dedicated onsite transformer · 3 x Diesel Generators as back-up – N + 1 · UPS system – redundant parallel formation – N + 1 • 8, 16 and 32 Amps available per rack Air-Conditioning · Multiple AC units to guarantee control of air conditioning and humidity – N + 1
Fire Protection & Security
• Very early smoke detection apparatus (VESDA) installed • FM200 fire suppression system• Under floor flood detection system • CCTV system covering all entrances/exits and main areas · 24-hour video recording • Full perimeter alarm • Biometric security access system for additional security • Visual verification of all persons entering the data floor Communications • Multiple Fibre connections into the building • Connectivity and fibre available to major carriers eg BT, NTL/Virgin & H20 • Satellite dish space available on the roof • Microwave space available on the roof • Dual diverse 10Gbps connectivity (upgradable to 100Gbps) Onsite Services • Shared, partitioned or dedicated space available - 24 hour access – 365 days a year • Remote Intelligent hands available 24 hours a day • Reboots by telephone and online through customer control panel • Managed services available • Onsite Cisco and Microsoft certified engineers
Milton Keynes
Power
• 2 x 3 megawatt sub-stations (N+N) • G&M generators (N+N) with 30 hours of on-site fuel storage • N+N Chloride UPS system @ 10 minutes autonomy • A+B power feeds to each rack • Power up to 15kW per rack available Air-Conditioning • N+1 chilled water Air handling system with free cooling • 22 C +/- 2 C data floor temperature
Fire Protection & Security
• 2-metre fencing and electric entry • Anti-tailgating systems • Entry to the buildings is via 24/7 swipe card systems • Multi layer entry and 24/7 on-site Security Communications • Distributed Colocation Options • Connectivity onto one of the UK's largest data centre Networks • Premium Connectivity Services • Multiple direct Tier 1 network providers • 40Gbps of Direct Upstream Connectivity • Reliability of one of the UK's largest independent colocation providers • Interconnects available direct to over 25 data centres across Europe • Geographically diverse connectivity from London and direct connectivity to Manchester available.
Onsite Services
• Colocation space available from single U’s to racks and suites • Restrooms and kitchen facilities available on all floors • Size: 25000 sq ft
Manchester
Power
• Dedicated onsite transformer · Standby Diesel Generators as back-up • N + 1 Redundant UPS system • 8, 16 Amps available per rack Air-Conditioning · Multiple AC units guarantee control of air conditioning & humidity - N + 1
Fire Protection & Security
• Very early smoke detection apparatus (VESDA) installed • FM200 fire suppression system • CCTV system covering all entrances/exits and main areas - 24-hour video recording • Full perimeter alarm • Visual verification of all persons entering the data floor Communications • Multiple Fibre connections into the building • Connectivity and fibre available from major carriers eg. BT, NTL/Virgin & Geo • Direct Tier 1 carriers available by Layer 2 network • Dual diverse connectivity to over 25 data centres Onsite Services • Shared, partitioned or dedicated space available - 24 hour access – 365 days a year • Remote Intelligent hands available 24 hours a day
For More Information...
Please contact us for more information regarding DCPSOL'S Data Centre Solutions on: +44 (0)2031119668 +44 (0)2031119668 Email: info@dcpsol.com * Contact Us
|